Copyright © 2017     Australian Commercial Fitouts Pty Ltd     ABN 24 617 958 264

Level 3, 480 Collins Street, Melbourne, VIC 3000

03 8610 6647     info@auscf.com

  • Black Facebook Icon
  • Black Instagram Icon
  • Black LinkedIn Icon

April 12, 2019

This outdated kitchen was once in an enclosed area hidden away. Fast forward two weeks and this area is now a feature in an open plan environment with the removal of surrounding walls, new tiles, new joinery and two kitchen high benches to accommodate 10 staff at a time!

April 10, 2019

This update isn't going to set the world of Instagram alight however we're proud to be working at Melbourne Airport and continue to show our construction diversity in building new cubicles in Terminal 4. Tight Security requires a lot of planning and professionalism on site. 

April 5, 2019

*** Before / After *** 
Kitchen makeovers are always the most satisfying part of an Office Refurbishment. Even before the tiles are laid this is looking like a winner in our eyes!

April 2, 2019

*** Before / After *** 
A sneak peak of a much larger project underway and nearing completion. Out with the old and in with the new!
From Building and Electrical, to Design and Furniture catered to our clients budget. 
 

March 23, 2019

A complete refurbishment is currently underway for one of Australia's largest home builders. 
Our team is currently completing the demolition stage and moving straight on to the new framework suited to the new layout. We all cannot wait to see this space completely transformed!
Stay tuned for imagery and updates, we'll do our best to share the progress as we move along.

March 21, 2019

We've had a quiet Blogging start to the year due to an unexpected surge in Building, Design and Furniture Supply.

Stay tuned for updates on some of our major projects currently in progress from Melbourne Airport to one of Australia's Largest domestic Home builders. It's looking like a fantastic year ahead! 

November 16, 2018

100% locally designed and manufactured in Australia by ACF, these desks were crafted to reflect our clients level of sophistication and detail given their high reputation in the Construction industry. 

September 4, 2018

From Render to Reality.

A free and Critical process that we conduct with every Fit-Out to ensure we achieve the highest level of accuracy on Site. 

August 29, 2018

When it's -2 degrees and the shorts come out!Another sunny Melbourne day. Perfect for an Office Refurbishment.

August 21, 2018

Works are completed for Hotel Agencies office in Fitzroy, consisting of an additional mezzanine office above their loading dock.
Finally completed, this area now facilitates an additional 13 staff, compactus storage room, boardroom, kitchen, toilets and 2 x managers' offices. 
Utilizing existing office space is a far cheaper alternative to sourcing a new tenancy.

Please reload

Featured Posts

Work in Progress - Refurbishment

March 23, 2019

1/10
Please reload

Recent Posts